Tammy1111 Tammy1111
  • 04-01-2016
  • Mathematics
contestada

a construction crew just finished building a road the crew worked for 4 1/3 days. if they built 2 1/7 kilometers of road each day what is the total length of road they built

Respuesta :

Billymkhoi
Billymkhoi Billymkhoi
  • 04-01-2016
4 1/3 days* (2 1/7 km of road/ 1 day)= 9.285714286... km of road.

The total length of the road they built is 9.286 km.

Hope this helps~
Answer Link

Otras preguntas

two identical freight cars roll without friction towards each other on a level track. one car rolls 2 m/s the other 1 m/s. after the cars collide they couple an
A child is standing across the street from his apartment . His mother is on their balcony . The angle of elevation between the child's eyes and his mothers eyes
A child is standing across the street from his apartment . His mother is on their balcony . The angle of elevation between the child's eyes and his mothers eyes
What is Sir Francis Drake hardships
Why is RNA necessary to act as messenger?
.is a pot holder a conductor or a insulator
How does transpiration play a  role in the water cycle ?
Does the depth of a pan affect how water freezes?
Does the depth of a pan affect how water freezes?
What is the numerator or denominator of 4/5