reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

A bag contains 6 red balls, 4 green balls, and 3 blue balls. If we choose a ball, then another ball without putting the first one back in the bag, what is the
if the length of a rectangle is increased by 40% and its width is decreased by 40% what is the effect on the rectangles area ?
Use the image below to answer the following question: How did this structure benefit China?
What is the equation of the line with a slope of 10 through the point (4, 9)
Lacy just started a gourmet chocolate bar business. She's spent months perfecting the bars from the ingredients to the wrapping. She has found a local candy sto
Triangle ABC is shown below :
In the 1920s, mass media helped popularizs which of these sports heroes?
What’s the answer?and how do you get it
ave buys a book for $8.58 and she pays with a $10 bill. how much change will she get back?
how many us troops were in Vietnam by 196950,000100,000500,0001,000,000​