carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

A midwestern music competition awarded 35 ribbons. The number of blue ribbons awarded was 3 less than the number of white ribbons. the number of red ribbons was
A biome that contains a layer of permanently frozen soil, called permafrost, would be classified as A. taiga B. desert C. tundra D. savannah E. temperate decidu
Meg pounded a stake into the ground. When she attached a leash to both the stake and her dog’s collar, the dog could reach 9 feet from the stake in any directio
What is the average of 30, 40, and 80?
How do enzymes help to carry out biochemical reactions? A. By decreasing the energy of the reactants B. By increasing the activation energy of the reaction C. B
Most autotrophs make “food” through the process of a. photosynthesis. b. homeostasis c. chemosynthesis d. cellular respiration
The sales tax rate is 8%. Estimate the tax on a jacket that costs $69.95.
How many prime numbers are there between 56 and 100?
given: quadrilateral ABCD with ∠A= ∠C and BD the bisector ∠ABC prove: DB bisects ∠ADC
If a circle is cut from a square piece of plywood, how much plywood would be left over? Use 3.14 for pi